Quest Interiors

London Studio
Studio 2
109 Gloucester Road
London SW7 4SS

T: 020 7460 2617

info@questinteriors.com

Quest Interiors Blog

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that have been used in the blog.
  • Bloggers
    Bloggers Search for your favorite blogger from this site.
  • Team Blogs
    Team Blogs Find your favorite team blogs here.
  • Login
Posted by on in News
  • Font size: Larger Smaller
  • Hits: 2193
  • 0 Comments
  • Print

Specialist Design and Build for Spire Southampton

Client: Spire Healthcare
Location: UK, Southampton
Date: On Site
Sector: FM/ Healthcare

About the Project:

Quest were approached by Spire in December 2015 to take on a client brief; develop and construct a new welfare faculty for the theatre staff and, an operating theatre to house a Divinci Robot – A First for Spire Hospitals!

Quest accepted the challenge, and works started on site in January 2016, under two phases; Phase 1 – New Divinci Robot Theatre – Completed June 2016.
Phase 2 – New Welfare Facility & Clinical Storage – completion due on the 4th July.

Spire Southampton

Project Challenges:

Works began on site in January 2016 for first phase of the project, this involved converting an existing staff room into a new theatre suitable for the Robot. This included a new concrete slab, structural alterations and working right next door to the Hospitals Main Theatre.

This required strong communication between Quest and the neighbouring theatre staff and
patients, which was reviewed daily at the forecast meetings, and with a best possible approach being communicated.

Quest Completed Phase 1 on time with the Theatre open and taking bookings the next day. Quest are now focussing on Phase 2 of the project, where the work is being carried out directly below the theatres. A vital part of Phase 2 is to ensure that the hand over is time, in order to provide the Hospital theatre staff with suitable welfare and additional storage facilities.

For full information about this project, download our case study here.

OUR SERVICES
• Brief Development
• Environment & Sustainable Design
• General Arrangement Plans
• Design Development
• Budget Control
• Design & Build
• Specialist Refurbishment Works
• Specialist Interior Works
• Complete After Care (FM Small Works)

For more examples of our work, visit www.questinteriors.com . To discuss your specialist interior refurbishment requirements, contact 020 3609 1312

Comments

  • No comments made yet. Be the first to submit a comment

Leave your comment

Guest Wednesday, 19 December 2018