About the project:

Quest Interiors was approached by Spire Healthcare to undertake a fast track turnkey project for Wirral Hospital in October 2015. They were tasked with completing a complete refurbishment of the existing day care unit into an additional day care unit catering for 7 beds. The project was to be completed by the of January 2016.

The project involved:

Quest were required to interpret the client brief and to develop a strong design, working closely with partnered Consultants throughout the project whilst implementing the complete project and handing back on time in within a tight budget.

Project challenges:

The project started and presented well until Quest began to strip back the existing layers of the building to discover some fundamental flaws in the existing structure. This resulted in a massive impact on the design and programme. These difficult challenges were overcome by the Quest team who managed to progress the project positively whilst resolving all issues to ensure that the deadline to handover wasn’t missed or the project, jeopardised.

The project was completed on time, with thanks to the dedication of the team and the contractors as well as positive support from the client, a successful outcome was achieved.

For full information about this project, download our case study here.

OUR SERVICES INCLUDE:
• Brief Development
• Environment & Sustainable Design
• General Arrangement Plans
• Design Development
• Budget Control
• Design & Build 
• Specialist Refurbishment Works
• Specialist Interior Works
• Complete After Care (FM Small Works)

For more examples of our work, visit www.questinteriors.com . To discuss your specialist interior refurbishment requirements, contact 020 3609 1312 .


Connect with Quest Interiors via the social networks:

Go HomeFind Us On LinkedInFind Us On FacebookQuest Google+Quest TwitterQuest PinterestQuest Slideshare